Anaerobic Capacity Hills #1

Duration 24:30 TSS 29 IF 0.85 Has RPM target
warmup 03:00 @ 45% FTP - 60% FTP
01:00 @ 65%
01:00 @ 81%
01:00 @ 109%
02:00 @ 50%
ramp 02:00 @ 60% FTP - 75% FTP @ 75RPM
00:30 @ 125% @ 75RPM
ramp 02:00 @ 75% FTP - 60% FTP
ramp 02:00 @ 60% FTP - 75% FTP @ 80RPM
01:00 @ 125% @ 80RPM
ramp 02:00 @ 75% FTP - 60% FTP
ramp 02:00 @ 60% FTP - 75% FTP @ 85RPM
02:00 @ 125% @ 85RPM
cooldown 03:00 @ 75% FTP - 60% FTP
This session replicates Anaerobic Capacity intervals performed on a climb by adding a target rpm. The climb starts steady enough before stepping up to the finish with high power.

Similar workouts