13min Progressive Climb

Duration 01:03:00 TSS 73 IF 0.83 Has instructions Has RPM target
  • 03:00 @ 45% FTP - 55% FTP
  • 00:20 @ 125% FTP
  • 03:00 @ 56% FTP - 65% FTP
  • 00:20 @ 125% FTP
  • 03:00 @ 66% FTP - 75% FTP
  • 00:20 @ 125% FTP
  • 01:00 @ 55% FTP
  • 01:00 @ 61% FTP - 79% FTP
  • 05:00 @ 80% FTP @ 85RPM
  • 01:00 @ 81% FTP - 94% FTP
  • 04:00 @ 95% FTP @ 85RPM
  • 01:00 @ 96% FTP - 104% FTP
  • 01:00 @ 105% FTP @ 85RPM
  • 04:00 @ 55% FTP
  • 01:00 @ 61% FTP - 79% FTP
  • 05:00 @ 80% FTP @ 80RPM
  • 01:00 @ 81% FTP - 94% FTP
  • 04:00 @ 95% FTP @ 80RPM
  • 01:00 @ 96% FTP - 104% FTP
  • 01:00 @ 105% FTP @ 80RPM
  • 04:00 @ 55% FTP
  • 01:00 @ 61% FTP - 79% FTP
  • 05:00 @ 80% FTP @ 75RPM
  • 01:00 @ 81% FTP - 94% FTP
  • 04:00 @ 95% FTP @ 75RPM
  • 01:00 @ 96% FTP - 104% FTP
  • 01:00 @ 105% FTP @ 75RPM
  • 05:00 @ 65% FTP - 45% FTP

There are three climbs of 13 minutes in duration today, but each is completed using a different cadence. As the power ramps up between steps, select your cadence before returning to the target cadence.

Position yourself on the bike as you would on a long climb. Like a climb outdoors, the required power will increase throughout the 13 minutes. We culminate with a 1 min above threshold at the top of the climb.
Data sourced from publicly available information on MyWhoosh Results. All rights to the data belong to their respective owners. This site is not affiliated with or endorsed by MyWhoosh.
Contact us: mywhooshinfo(at)gmail.com
mywhooshinfo
© 2024 MyWhooshInfo.com. All rights reserved.