Tempo Climbing #1

Duration 01:00:30 TSS 72 IF 0.84 Has RPM target
  • 10:00 @ 50% FTP - 75% FTP
  • 10:00 @ 88% FTP @ 75RPM
  • 00:30 @ 150% FTP
  • 05:00 @ 55% FTP
  • 08:00 @ 80% FTP @ 75RPM
  • 07:00 @ 98% FTP
  • 05:00 @ 55% FTP
  • 05:00 @ 80% FTP @ 75RPM
  • 05:00 @ 105% FTP
  • 05:00 @ 75% FTP - 50% FTP

The basis of today's session is to simulate long tempo climbs. However, each interval is completed with a different high-intensity effort, with the tempo portion of each interval conducted at a low climbing cadence.
Data sourced from publicly available information on MyWhoosh Results. All rights to the data belong to their respective owners. This site is not affiliated with or endorsed by MyWhoosh.
Contact us: mywhooshinfo(at)gmail.com
mywhooshinfo
© 2024 MyWhooshInfo.com. All rights reserved.